232 St. & 64 Ave. Roundabout Construction, Township of Langley

All Roads in 2019

Still Creek Roundabout Construction for City of Burnaby

This latest project by ALL Roads converted heavily congested T-intersection into a roundabout configuration without traffic lights for the City of Burnaby. It was interesting and challenging job site due to its very tight and limited working area for large construction equipment, as well as heavy traffic from 3 approaches that gets congested constantly.

One thing worth emphasizing about this contract is that we self-performed with our own crews internally at ALL Roads the entire scope of works, which included, excavating, underground work, pouring concrete for new curb and gutter installation, pavement rehabilitation, light way fills installation, catch basins, lawn basins, storm drainage, permanent and decorative stamped concrete, sidewalk building, and pavement markings.

How Road Rehabilitation is Done

Lump Sum End Product Specification Contract, that included the following:

Excavation and embankment, supply, grading, and installation of granular base and subbase, various types of Geogrid Placement, Milling, Reclaiming, asphalt concrete paving, pavement markings, concrete and asphalt sidewalk, asphalt multi-use pathway, modification of existing and construction of new curb and islands, modification of existing and construction of new Manholes, catchbasins and lawnbasins, Rail Crossings, sodding and seeding, and gravel shouldering.

Asphalt milling with our brand new Wirtgen 210i

Milling for the City of Abbotsford with new Wirtgen 210i