×
604.227.5400 Got Questions?
Road Construction Projects What's New Careers About Us Asphalt Plant Contact

Videos


showing 25 to 30 of 43 on page 5
    1  2  3  4  5  6  7  8    

ALL ROARDS in 2020

A year-end review of our successes in 2020.

Concrete Curbing and Surface Work by ALL ROADS Construction in Vancouver Area

All Roads - State of the Art Asphalt Plant Tour

@civil_gorilla tours the All Roads Asphalt Plant in Coquitlam.  Their plant manager shows us around and we talk about technology in paving. All Roads president Rod Stephens gives us his perspective on getting the plant off the ground and why he is so proud of their commitment to the environment. Produced by @pushysix

Highway 1 Resurfacing - Willingdon Ave. to Gaglardi Way, Burnaby

The $7.4-million project includes resurfacing Highway 1 in both directions including the shoulders and on and off ramps of connecting interchanges. We work closely with both WorkSafeBC and the provincial ministry of transportation and infrastructure. We ensure COVID-19 protocols including social distancing are followed during the construction work. To minimize driving delays work is done at night with a minimum of two lanes open to traffic through the work zone.

All Roads Asphalt Plant Construction - Part 3 - First Day of Asphalt Production

On this bustling day we've produced our own asphalt and started paving our plant site. It was successful live production quality test for our state-of-the-art facility!

All Roads Asphalt Plant Construction - Part 2 - Control Tower Lift

This is how we hoisted the control center of our brand new asphalt plant and powered it up for the first time.

showing 25 to 30 of 43 on page 5
    1  2  3  4  5  6  7  8