City of Burnaby - Still Creek Drive at Eastbrook Parkway Roundabout

Print| Email a Friend| Back


Completed with City Performance Evaluation of 93.74

Completion Date: November 14, 2019

This latest project by ALL Roads converted heavily congested T-intersection into a roundabout configuration without traffic lights for the City of Burnaby. It was interesting and challenging job site due to its very tight and limited working area for large construction equipment, as well as heavy traffic from 3 approaches that gets congested constantly.

One thing worth emphasizing about this contract is that we self-performed with our own crews internally at ALL Roads the entire scope of works, which included, excavating, underground work, pouring concrete for new curb and gutter installation, pavement rehabilitation, light way fills installation, catch basins, lawn basins, storm drainage, permanent and decorative stamped concrete, sidewalk building, and pavement markings.

  • Upgrade T Intersection to New Roundabout Configuration
  • Common Excavation
  • Asphalt Milling
  • Granular Base Construction
  • Lightweight Fill
  • Storm Drainage Improvements
  • Misc. Concrete Works.
  • Asphalt Paving
  • Landscaping Improvements
  • Roadway Lighting

Client: City of Burnaby
Project Engineer Information: McElhanney Consulting Services

 