Highway 91 & Highway 17 Upgrade Project, Metro Vancouver, BC

Contractor: Pacific Gateway Constructors

Owner: Her Majesty the Queen in Right of The Province of British Columbia, as represented by The Minister of Transportation and Infrastructure

Project/Work Description:

- 80,000 Metric Tonnes of Asphalt Paving
- Asphalt Milling
- 120,000m2 of Granular Base Preparation
- 5,500 Lineal-Meters of Concrete Curb
- 3,000 m2 of Concrete Flatwork Including Mountable Concrete Roundabouts
- Extensive Quality Control and Quality Management

Technologies used to maximize safety and provide a superior performing asphalt and ride:

- SmoothRide
- Intelligent Compaction
- Notch Wedge Safety Joint
- GPS Grading & Curb for maximum accuracy


Date Added: 2023-02-02