Asphalt Resurfacing Highway 1 Coquitlam Area (62.4 LANE KM)


Date Posted : September 18, 2023

Print| Email a Friend| Back


GPS, LPS & PaveLink Set-up for Scanning, Design and Real time tracking including load times, truck travel routes, asphalt usage, mat temperature, rolling pattens and densities.


Brunette River Bridge to Port Mann Bridge, Ministry of Transportation and Infrastructure


Completion date: October 2023

  • 50,498 Metric Tonnes of Asphalt Paving
  • 47,000 m2 of Full/Variable Depth Asphalt Milling
  • 19,416 LM of Concrete Barrier Removal & Replacement
  • 10 Crash Attenuators
  • Extensive Quality Assurance
  • Full GPS LPS Milling, Paving & PaveLink
  • Extensive Traffic Management & Control

Client:

  • Ministry of Transportation and Infrastructure – Vincent Ong
    Ph: 1-236-862-0601

Project Supervisor:

  • Ministry of Transportation and Infrastructure - Renato Suarez
    Ph: 1-778-621-2030

Project Associates:

  • Kontur Geotechnical
  • Eagle West Cranes